Case Studies

We have an impressive client base across a wide range of industries and services. These indicate our wealth of experience in working on a range of applications, such as:

  • Operating theatres, Category 3 / 4 labs and other clean room / aseptic suite projects for both the NHS Trust and private medical groups, research and pharmaceutical organisations;
  • Production areas in industries where sterile and/or high performance coatings are required;
  • Specialist projects such as radiation decontamination cells and experimental suites;
  • Refurbishment and ongoing maintenance using specialist coatings;
  • Installation of durable coatings in areas where general impact resistance and cleanability are important (waiting rooms, corridors, circulation areas);
  • ‘Wet’ areas – changing rooms, shower blocks, swimming pool environments;
  • Projects where corrosion and fire protection coatings are required.

We work for a range of clients: major contractors, specialist contractors, FM companies and end-users. We would be happy to provide further details and client references, on request.

nucleus

Nucleus Healthcare, Newport

The specific aim of this project was to modify an existing Endoscopy room to form a new operating theatre at Nucleus Healthcare in Newport. The installer directing the project was Fulbourn Medical, a long term specialist installation company in Cambridge. … Continue reading

roth

Rother House Medical Centre

As part of the refurbishment contract at Rother House Medical Centre, Goss Environmental was selected by main contractor Clean Modules Ltd to supply and install nearly 200m2 of sterile coatings within the new operating theatre and adjacent areas. Tretoplast WB … Continue reading

MAIN POOL  IMG_8187

Spiceball Leisure Centre

The design team sought an alternative coating system to acrylated rubber to use on the walls and ceilings in the swimming pool and changing room areas. The coating would need to provide a functionally effective barrier for the two environments … Continue reading

virgin

Virgin First Class Lounge

The aim of this project was to install a high performance, durable and cleanable coating system to the high impact wall surfaces of the Virgin First Class Lounge at London Euston. The problem experienced by Virgin (and to be resolved … Continue reading

cat-2

Cambridge CAT 2 Laboratory

As part of the on-going expansion of the facility, the internal walls and ceiling of this new build category 2 laboratory required a hygienic coating that could withstand cleaning with bacteriocidal/virocidal cleansing agents. Liquid Plastics’ Steridex and Sterimatt were specified … Continue reading